User Tools

Site Tools


documentation:vocabulary:drg

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
documentation:vocabulary:drg [2021/04/15 09:33]
ptalapova
documentation:vocabulary:drg [2021/04/15 09:35] (current)
ptalapova [ETL process]
Line 16: Line 16:
   * MS-DRG   * MS-DRG
  
-==== for ETL ==== +==== ETL process ​==== 
-1. If event_date <= 2007-09-30 source DRG codes should be mapped to source_vocabulary_id = '​DRG'​ and source concept_class_id = '​DRG'​ +  ​- ​If event_date < = 2007-09-30 source DRG codes should be mapped to source_vocabulary_id = '​DRG'​ and source concept_class_id = '​DRG'​ 
-2. If event_date >= 2007-10-01 source DRG codes should be mapped to source vocabulary_id = '​DRG'​ and source concept_class_id = '​MS-DRG'​+  ​- ​If event_date > = 2007-10-01 source DRG codes should be mapped to source vocabulary_id = '​DRG'​ and source concept_class_id = '​MS-DRG'​
  
-Note: MS-DRG codes of '​156',​ '​155',​ '​251','​154',​ '​250'​ should be filtered using "invalid_reason is null" ​due to the intersecation ​of valid dates.+Note: MS-DRG codes of '​156',​ '​155',​ '​251','​154',​ '​250'​ should be filtered using //invalid_reason is null// due to the intersection ​of valid dates.
documentation/vocabulary/drg.1618479222.txt.gz · Last modified: 2021/04/15 09:33 by ptalapova