User Tools

Site Tools


projects:workgroups:achilles_2.0

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
projects:workgroups:achilles_2.0 [2019/10/28 17:47] – ajit_londheprojects:workgroups:achilles_2.0 [2019/12/03 17:32] (current) – ajit_londhe
Line 3: Line 3:
 <WRAP box justify round> <WRAP box justify round>
  
-**Objective:** The Achilles Working Group is a forum for discussions related to database characterization and data quality using the Achilles R package. We welcome anyone interested in better characterizing their data source through discussing new feature design or volunteering for leading some element of software development.+**Objective:** The Achilles Working Group is a forum for discussions related to database characterization using the Achilles R package. We welcome anyone interested in better characterizing their data source through discussing new feature design or volunteering for leading some element of software development.
  
 **Product Owner:**  Ajit Londhe **Product Owner:**  Ajit Londhe
 +
 +**Frequency:** First Wednesday of the month (unless otherwise stated)
  
 **Start Date:**  January 30, 2019 **Start Date:**  January 30, 2019
  
-**Next Date:**  November 26, 2019 at 2 pm est+**Next Date:**  December 4, 2019 at 2 pm est
  
 **Repository:**  https://github.com/OHDSI/Achilles **Repository:**  https://github.com/OHDSI/Achilles
 +
 +**Conference Link:** https://meet.amgen.com/alondhe/JLS3NYN0
  
 </WRAP> </WRAP>
projects/workgroups/achilles_2.0.1572284874.txt.gz · Last modified: by ajit_londhe

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki