User Tools

Site Tools


documentation:vocabulary:drg

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
documentation:vocabulary:drg [2021/04/15 09:33]
ptalapova
documentation:vocabulary:drg [2021/04/15 09:35]
ptalapova [ETL process]
Line 16: Line 16:
   * MS-DRG   * MS-DRG
  
-==== for ETL ==== +==== ETL process ​==== 
-1. If event_date <= 2007-09-30 source DRG codes should be mapped to source_vocabulary_id = '​DRG'​ and source concept_class_id = '​DRG'​ +  ​- ​If event_date <= 2007-09-30 source DRG codes should be mapped to source_vocabulary_id = '​DRG'​ and source concept_class_id = '​DRG'​ 
-2. If event_date >= 2007-10-01 source DRG codes should be mapped to source vocabulary_id = '​DRG'​ and source concept_class_id = '​MS-DRG'​+  ​- ​If event_date >= 2007-10-01 source DRG codes should be mapped to source vocabulary_id = '​DRG'​ and source concept_class_id = '​MS-DRG'​
  
-Note: MS-DRG codes of '​156',​ '​155',​ '​251','​154',​ '​250'​ should be filtered using "invalid_reason is null" ​due to the intersecation ​of valid dates.+Note: MS-DRG codes of '​156',​ '​155',​ '​251','​154',​ '​250'​ should be filtered using //invalid_reason is null// due to the intersection ​of valid dates.
documentation/vocabulary/drg.txt · Last modified: 2021/04/15 09:35 by ptalapova